PROJECT MAP

The place becomes the index.

Click the pond, containers, terrace, energy system, access path or booking state to open the workstream connected to that physical component. The list still exists underneath, but the site map is now the front door.

COMPONENTS

Manage by touching the thing you mean.

Each component groups the relevant milestones across place, water, energy, experience and operations, so cross-cutting systems stay visible instead of being buried in separate lists.

SOURCE2 open

Muuraislampi source

Source, intake, pump route and multi-season validation.

  • W01 Muuraislampi as the intended water source
  • W02 Automatic pumped supply from the lampi
  • W03 Laboratory water analysis
MODULEdone

Sauna container

Wood sauna, floor heating, water inlet, shower and guest operation.

  • P02 Sauna container on site
  • X02 Wood sauna experience
MODULE4 open

Kitchen / sleeping container

Third module, kitchen, potable tap and treated-water distribution.

  • P04 Kitchen / sleeping container
  • W05 RO / UV drinking-water treatment
  • W06 Commission guest water system
  • X04 Kitchen / sleeping setup
MODULE1 open

Living / sleeping container

Existing accommodation module and guest sleeping setup.

  • P03 Living / sleeping container on site
  • X03 Living / sleeping setup
STRUCTURE3 open

Terrace / shared outdoor room

Container relationship, modular terrace platform and circulation.

  • P05 Final three-container layout
  • P06 Terrace and shared outdoor room
  • P07 Guest circulation and arrival
SYSTEM6 open

Energy system

Solar, buffer battery, EV reserve, smart PDU and availability states.

  • E01 Electricity available from EV
  • E02 Load model and control strategy
  • E03 Smart and safe PDU
  • E04 Solar generation
  • E05 Small buffer battery
  • E06 Managed EV reserve integration
  • E07 Three availability states
EXPERIENCE1 open

Tree lights / night identity

Solar tree lights and on-site guide/QR layer.

  • X01 Tree lights
  • X05 Contextual guides and QR entry points
ACCESS2 open

Access / arrival

Road, parking edge, walking routes and trial-stay feedback.

  • P01 Land, lampi and access
  • P07 Guest circulation and arrival
  • O05 Trial stays and opening review
OPERATIONS7 open

Booking and operations

Opening gates, issue reporting, safety checklist and fail-safe water/energy states.

  • W06 Commission guest water system
  • E07 Three availability states
  • O01 Public project plan online
  • O02 Booking system
  • O03 Real-time issue ticketing
  • O04 Safety and commissioning checklist
  • O05 Trial stays and opening review

DESIGN RULE

The map is navigation, not decoration.

Badges show open work. Red is reserved for real blocker/safety states. Potable water and energy availability remain fail-safe states before booking can depend on them.

Back to milestone list →